Techno Feasibility Study
" Reconnaissance survey for selection of the best technically suitable alignment.
" Conducting detail survey along the selected alignment.
" Selection of the best suited Ropeway system and working out technical parameters for the same.
" Preparation of tentative profile and Station Arrangement Drawings.
" Working out the cost with Gross Item wise break up.
" Working out Operation and Maintenance Cost.
" Submission of a Consolidated Detailed Project Report containing all the above information in 2 (two) hard copies and 1 (one) soft copy.
List of work executed  (Techno-Economic Feasibility Study)
SL. JOB DESCRIPTION CUSTOMER COMPLETION

1.

Techno Economic Study on installation of Ropeway between Auli and Parsano near Joshimath on the Garhwal Himalayas.

Triveni Structurals Ltd.Naini, UP.

1977

2.

Conducting Techno-Economic Survey and Feasibility Study on existing Goods Ropeway for conversion into a Passenger Ropeway.

Government of West Bengal

1982

3.

Techno-Commercial Report indicating solution for increasing  capacity of the Darjeeling-Rangeet Valley Passenger Ropeway.

WB Forest Development Corpn. Ltd.

1984

4.

Technical Feasibility Report for increasing the capacity of a Material Ropeway.

Udaipur Cement Works

1984

5.

Technical Feasibility Report on operational improvement of an existing Ropeway, Czekoslovak make.

Renusagar Power Co. Ltd., UP

1986

6.

Report on the Financial Viability of Mount Juneau Aerial Tramcar.

Alaska Trams Inc. USA

1987

7.

Techno-Economic Feasibility Study on installation of an Aerial Ropeways between Jaianbari and Tirthamukh in Tripura.

North Eastern Council Shillong.

1991

8.

Techno-Economic Feasibility Study on installation of an Aerial Ropeways between Chatlang & Durtlang in Mizoram.

NECS

1991

9.

Techno-Economic Feasibility Study on installation of an Aerial Ropeways between Lawngtlai & Saiha in Mizoram.

NECS

1991

10.

Ground Survey, selection of most suitable systems & alignmnent and Feasibility Study on Aerial Transportation System for Transportation of Lime Stone over a distance of 20 KM.

Diamond Cements, Damoh, M.P.

1992

11.

Techno-Economic Feasibility Study and Selection of most suitable means of transportation of material from top of a hill to the Plant.

Hetauda Cement Industries Ltd., Nepal .

1993

12.

Feasibility Study for Aerial Ropeway Transportation of Coal from Pench Valley Coalfields to Pench Thermal Power Station near Chindwara, MP.

Vogue Const. & Constancy, Noida.

1997

13.

Feasibility Study for proposed Passenger Ropeway System to Samdruptse Hilltop at Namchi , Sikkim .

Sikkim Tourism, Gangtok.

2000

14. Feasibility Study for a Passenger Ropeway from Bharalumukh to Kamakhya Hill, Guwahati. Assam Tourism, Guwahati 2002
15. Techno-Feasibility Study for installation of a Passenger Ropeway between Deviguriya Hill and Ralamondal, Indore Forest Deptt, Indore 2007
16. Techno-Economic Feasibility Study for installation of 650 TPH Material Ropeway between Siom Mines and Yeshwant Nagar Railway Siding, Karnataka, for transport of Iron Ore. Mukund Steels Ltd., Ginnigera, Karnataka 2008
17. Techno-Economic Feasibility Study for installation of 500 TPH Material Ropeway between Mines and Stockyard near Ammasandra Railway Siding, Karnataka, for transport of Iron Ore. Mineral Enterprises Ltd, Karnataka 2008
18. Techno-Economic Feasibility Study for installation of 650 TPH Material Ropeway between SIOM Mines and proposed ANKAMALAI Railway Siding, Karnataka, for transport of Iron Ore. Mukund Steels Ltd., Ginnigera, Karnataka 2008
19. Techno-Economic Feasibility Study for installation of a  Passenger Ropeway at  MunnarHills, Kerala Kannan Devan Hills Plantation Co. Pvt Ltd, Munnar 2008
20. Techno – Economic Feasibility Study for up gradation of existing Material Ropeway from 40 TPH to 150 TPH capacity HIL, Jharkhand 2011
21. Techno – Economic Feasibility Study for installation of a Material Ropeway from Mines to Factory PCAL, Bhutan Under execution
22. Technical Audit of Existing Passenger Ropeway, in Indonesia Breco Ropeways Ltd, UK Under execution