top of page
About
CRS has designed, built, supplied and successfully converted a material ropeway of length 10km from 90 TPH to 180 TPH for transportation of Bauxite.
Specifications
Client: Hindalco Industries Limited, Mines Division
System: Bicable Ropeway
Capacity: 150 TPH
Length: 9.8 Km
Level Difference: 0.37 Km

Lohardaga, Jharkhand
bottom of page