top of page
  • LinkedIn
  • Facebook
  • Instagram

About

CRSPL first built a 8km long detachable grip type monocable ropeway of 300 THP capacity over a rugged terrain. It was India’s first detachable grip industrial ropeway. Later, when its purpose was finally met the ropeway was converted to a bicable system, truncating its length.

Specifications

Client: Hindalco Industries Limited, Renupower Division

System: Bicable Ropeway

Capacity: 350 TPH

Length: 2500 mt

Level Difference: 3 mt

Renusagar, Uttar Pradesh

Other Projects

Gharibwal, Pakistan

Narsingarh, Damoh

Lohardaga, Jharkhand

bottom of page